Message Date: May 21 2013 05:19:18
THE WFO SAN JUAN (TJUA) WSR-88D HAS UNDERGONE THE DUAL POL UPGRADE AND IS PRESEN
TLY UP AND RUNNING. IT WILL HOWEVER BE UNDERGOING POST-INSTALLATION OPERATIONAL
AND SYSTEM ACCEPTANCE CHECKS/TESTS DURING THE NEXT 24 HOURS. -RAM
Message Date: May 21 2013 05:19:18
THE WFO SAN JUAN (TJUA) WSR-88D HAS UNDERGONE THE DUAL POL UPGRADE AND IS PRESEN
TLY UP AND RUNNING. IT WILL HOWEVER BE UNDERGOING POST-INSTALLATION OPERATIONAL
AND SYSTEM ACCEPTANCE CHECKS/TESTS DURING THE NEXT 24 HOURS. -RAM